Before you start utilizing planning engine, we recommend deciding about whether or not to use locations. There are two main straightforward ways:

  • demand lines always carry location codes and the system fully uses stockkeeping units, including the relevant location setup. Learn more at Demand at location.
  • demand lines never carry location codes and the system uses the item card. See the Demand at a "blank location" scenario below.

Demand at location

When the planning system detects demand at a location (a line with a location code), it will behave in different ways depending on 2 critical setup values.

During a planning run, the system checks for the 2 setup values in sequence and plans accordingly:

  1. Does a SKU exist for the item on the demanded location?

    If yes, then:

    The item is planned according to planning parameters on the SKU card.

    If no, then:

  2. Does the Components at Location field in the Manufacturing Setup page contain the demanded location code?

    If yes, then:

    The item is planned according to planning parameters on the item card.

    If no, then:

    The item is planned according to the "minimal alternative" which covers the exact demand. The planning parameters are set as: Reordering Policy = Lot-for-Lot, Include Inventory = Yes, all other planning parameters = Empty. (Items using reordering policy Order remain using Order as well as the other settings.)

Tip

If you often plan for demand at different locations, then we recommend that you use the stockkeeping units capability and avoid demand on blank location. Learn more at Set Up Stockkeeping Units

See variations in the scenarios below.

 Note

The Components at Location field in the Manufacturing Setup page are very important in governing how the planning system handles production demand lines.

For production demand, Business Central will use the same location for subassembly and components as the one stated on the production order. However, by filling in this field, you can redirect the subassembly and components to another location.

You can also define this for a specific SKU by selecting a different location code in the Components at Location field on the SKU card. Note, however, that this rarely makes sense as the planning logic may be distorted when planning for the SKU component.

Demand at "blank location"

In general, when the planning system detects demand at a blank location (a line without a location code), the item is planned according to planning parameters on the item card.

The Locations Mandatory field in the Inventory Setup page, the Components at Location field in the Manufacturing Setup page, or stockkeeping units will affect how the planning system handles demand lines with/without location codes. If one of following statements is true, the demand on blank location is also considered a deviation and the planning system will react by outputting the "minimal alternative": The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

  • The Components at Location field in the Manufacturing Setup page has a value.
  • A stockkeeping unit exists for the planned item.
  • The Location Mandatory field is selected.

Scenarios

See variations in the setup scenarios below.

Setup 1

  • Location Mandatory = Yes
  • SKU is set up for WEST
  • Component at Location = EAST

Case 1.1: Demand is at WEST location

The item is planned according to planning parameters on the SKU card (including possible transfer).

Case 1.2: Demand is at EAST location

The item is planned according to planning parameters on the item card.

Case 1.3: Demand is at MAIN location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Case 1.4: Demand is at BLANK location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Setup 2

  • Location Mandatory = Yes
  • No SKU exists
  • Component at Location = EAST

Case 2.1: Demand is at WEST location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Case 2.2: Demand is at EAST location

The item is planned according to planning parameters on the item card.

Setup 3

  • Location Mandatory = No
  • No SKU exists
  • Component at Location = EAST

Case 3.1: Demand is at WEST location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Case 3.2: Demand is at EAST location

The item is planned according to planning parameters on the item card.

Case 3.3: Demand is at BLANK location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Setup 4

  • Location Mandatory = No
  • No SKU exists
  • Component at Location = BLANK

Case 4.1: Demand is at EAST location

The item is planned according to: Reordering Policy = Lot-for-Lot (Order remains Order), Include Inventory = Yes, all other planning parameters = Empty.

Case 4.2: Demand is at BLANK location

The item is planned according to planning parameters on the item card.

As you can see from the last scenario, the only way to get a correct result for a demand line without a location code is to disable all setup values relating to locations. Similarly, the only way to get stable planning results for demand at locations is to use stockkeeping units.

Therefore, if you often plan for demand at locations, then we recommend that you use the Stockkeeping Units capability.

See also

Planning
Set Up Manufacturing
Manufacturing
Inventory
Set Up Stockkeeping Units
Purchasing
Design Details: Supply Planning
Setup Best Practices: Supply Planning


    • Related Articles

    • Planning

      In this article See also Start a free trial! The production operations required to transform inputs into finished goods must be planned daily or weekly depending on the volume and nature of the products. Business Central offers features to supply for ...
    • About Planning Functionality

      In this article Supply and demand Planning calculation Planning with manual transfer orders Planning parametersShow 3 more The planning system takes all demand and supply data into account, nets the results, and creates suggestions for balancing the ...
    • Subcontract Manufacturing

      In this article Subcontract Work Centers Calculate Subcontracting Worksheets and Create Subcontract Purchase Orders Posting Subcontract Purchase Orders To post a subcontract purchase order See Also Subcontracting selected operations to vendor is ...
    • Setting Up Manufacturing

      To convert material into produced end items, production resources, such as bills of material, routings, machine operators, and machinery must be set up in the system. Operators and machines are represented in the system as machine centers that may be ...
    • Run Full Planning, MPS, or MRP

      In this article Methods for generating a plan To calculate the planning worksheet To perform action messages Action messages See also The terms "running the planning worksheet" or "running MRP" refer to calculating the master production schedule and ...